Finished bathroom with tiled walls, walk in shower and wall hung basin

Bathroom Renovations

Full Bathroom Refit

Old suite stripped out, new pipework and waterproofing, then tiling and sanitaryware fitted.

South LondonBathroom Renovations

Location
South London
Related service
Bathroom Renovations
Project type
Full bathroom renovation

The project

What the job involved

The challenge

The bathroom was dated, the layout wasted space and the old shower area had no reliable waterproofing behind the tiles.

The work

Everything came out back to bare walls. Supply and waste pipework was re-run for the new layout, wet areas were tanked, then the walls and floor were tiled and the new suite fitted.

The result

A straightforward, properly waterproofed bathroom with a walk in shower, tiled walls and floor, and everything sealed and tested.

Scope of work

What was carried out

  1. 01

    Strip out and disposal

    Old suite and tiles removed and taken away.

  2. 02

    Pipework and tanking

    Supply and waste re-run, wet areas tanked before tiling.

  3. 03

    Wall and floor tiling

    Tiles set out, cut and grouted throughout.

  4. 04

    Suite and sealing

    Shower, basin and toilet fitted, sealed and tested.

Related service

Interested in similar bathroom renovations work?

Complete bathroom, shower room and wet room installations finished to a clean, watertight standard.

View Bathroom Renovations

FAQs

Full Bathroom Refit questions

If your question is not covered here, call or send a message and we will answer it directly.

Do you waterproof the shower area before tiling?
Yes. Wet areas are tanked over a suitable board or substrate before any tile goes on, which is what stops water tracking behind the tiles later.
Can the bathroom layout be changed?
Usually yes. Supply and waste pipework can be re-run to move the shower, basin or toilet, within what the existing soil and waste positions allow.
Do you supply the tiles and sanitaryware or do I?
Either. Many customers choose their own suite and tiles and we fit them, or we can price supply and fit together.
How long is a bathroom out of use?
A full refit is normally a matter of days rather than weeks, depending on tiling and drying times. We confirm the programme before starting.
Do you clear away the old suite and tiles?
Yes. Strip out, disposal and a clean finish at the end are part of the job.
Do you fit bathrooms for landlords in South London?
Yes. We regularly work for landlords, letting agents and property managers across Croydon and South London.

Next step

Planning a similar bathroom renovations project?

Tell us what needs doing at your property and we will take it from there. We cover South London and the wider South London area, Mon to Sat, 8am to 6pm.